Patient intake that stopped depending on who was on shift
A 22-clinic network had intake times ranging from 9 to 34 minutes for the same appointment type. We standardised the workflow around roles rather than individuals and recovered 27% capacity.
The situation
Each clinic had evolved its own intake sequence. The variance was not driven by patient mix but by which staff member was working: three of the four front-desk roles had overlapping responsibilities and no defined handoff, so work was either duplicated or dropped.
What we actually changed.
Time-and-motion across 14 clinics
We observed 210 intakes and recorded every wait state. The largest single loss was not documentation speed — it was the 4.1 minutes average spent locating a colleague to confirm insurance eligibility.
One workflow, four roles, three handoff contracts
Intake was redesigned as a role-based flow with explicit input and output states. Eligibility moved to a scheduled pre-visit task with a defined owner, removing it from the day-of critical path.
Instrumented the queue
A simple daily flow board gave clinic managers visibility of backlog before 10am rather than at end of day, allowing staffing to flex within the shift.
Audited at ninety days.
Average intake time fell to 11 minutes with a standard deviation of 2.4. The network absorbed a 27% volume increase without new headcount, and administrative rework on insurance eligibility dropped by more than a third.
“The redesign was unglamorous and completely effective. Nobody had ever written down who was supposed to do what at 8:40 in the morning.”
Director of Operations, Meridian Health PartnersOther engagements.
Order-to-cash, rebuilt around the exception instead of the rule
A freight operator with 1,400 staff was quoting in 11 days and invoicing late on a third of orders. We rebuilt the process around the 18% of shipments that generated 71% of the delay.
One approval path for a firm that had eleven
A $3.2B asset manager required up to nine signatures for routine expenditures and averaged 6.1 days to approve. We cut 42 steps and rebuilt delegation of authority by value and reversibility.
A comparable process in your business?
Send us the process and the number you already track. We will tell you what a diagnostic would likely find.