Three engagements, three numbers that moved.
Each case below is written from the source data: the baseline we measured, the design we changed, and the result we audited at ninety days. Client names are used with permission.
Order-to-cash, rebuilt around the exception instead of the rule
A freight operator with 1,400 staff was quoting in 11 days and invoicing late on a third of orders. We rebuilt the process around the 18% of shipments that generated 71% of the delay.
Patient intake that stopped depending on who was on shift
A 22-clinic network had intake times ranging from 9 to 34 minutes for the same appointment type. We standardised the workflow around roles rather than individuals and recovered 27% capacity.
One approval path for a firm that had eleven
A $3.2B asset manager required up to nine signatures for routine expenditures and averaged 6.1 days to approve. We cut 42 steps and rebuilt delegation of authority by value and reversibility.
Your process could be the fourth.
Want the full diagnostic behind one of these?
We can walk through the baseline model for a comparable engagement on a 30-minute call, including what did not work.