Service 01 / 04 · Core practice

Business Process Optimization

Most operating processes were never designed — they accumulated. A control added after an audit, a step added by a manager who left in 2019, a report that exists because someone once asked for it. We map what actually happens, price the waste, and rebuild the process around the work that creates value.

Typical engagement: 9–11 weeks · Fixed fee
Signals

You are probably here because one of these is true.

  • ×Cycle times that grew quietly, quarter after quarter
  • ×The same data entered into a second system by a second person
  • ×Exceptions handled by two people who “just know”
  • ×Cost per unit nobody can explain from first principles
Deliverables

What leaves the building.

Every artefact below is written for the person who has to run the process on Monday morning, not for the appendix of a deck.

  • 01Current-state process maps at activity level, not slide level
  • 02Value / non-value classification with volumes attached
  • 03Root-cause register with a named owner per cause
  • 04Future-state process design tested against edge cases
  • 05Cycle-time and cost-to-serve model in a live workbook
  • 06Sequenced implementation backlog, ordered by payback
Engagement shape

How the weeks are spent.

Fixed phases, fixed durations, one named owner on our side and one on yours. No open-ended discovery.

Diagnose

2 weeks

Interviews, system extracts and floor-level shadowing to establish the real process — not the documented one.

Quantify

1 week

Cycle time, rework, failure demand and cost-to-serve modelled from your actual transaction data.

Redesign

2 weeks

Future-state process, decision rights and control points, stress-tested against the exceptions that break it.

Deploy

4 weeks

Pilot, SOPs, role training and a KPI cadence, with a 90-day sustain plan and named process owners.

Outcomes

What we are measured on.

Averages across comparable engagements. We agree the target range before kick-off and report against it at week six and week twelve.

38%
average cycle-time reduction across engagements
52%
reduction in rework volume within two quarters
4.2×
return on engagement fees, audited at month six
Questions

Before you commit.

If your question is not here, send it — we answer scope questions in writing before any engagement letter.

Ask a question
Do you work with our existing systems?
Yes. We are system-agnostic and deliberately so. Roughly two thirds of the waste we find sits between systems rather than inside them, so we design the process first and specify system changes second.
How much of our team's time will this take?
Expect two to three hours per process owner during diagnosis, and one workshop per function during redesign. We do the analysis; we do not ask your team to build the maps.
What if we already have process documentation?
We will read it, then verify it against reality. In our experience roughly 40% of documented steps are no longer performed and 30% of performed steps were never documented.
Can you work with a single process?
Yes. Most engagements start with one end-to-end process — order-to-cash, quote-to-delivery, intake-to-schedule — and expand once the first result is measurable.
Next practice Workflow Design
NEXT STEP

Start with a two-week diagnostic.

Fixed fee, fixed scope, and a written answer to where the waste sits in one process of your choosing.