Operational Efficiency
Every operating leader has a theory about where the time goes. Almost none of those theories survive a time-and-motion sample. We build the capacity model, price the leak in hours and dollars, and sequence the fixes by payback — so the first change you make is the one that pays for the programme.
You are probably here because one of these is true.
- ×Utilisation reported at 90% while output says something else
- ×Overtime treated as a permanent cost line rather than a symptom
- ×Queues that grow predictably at month end and nobody plans for it
- ×Reporting that takes three days to produce and is stale on arrival
What leaves the building.
Every artefact below is written for the person who has to run the process on Monday morning, not for the appendix of a deck.
- 01Capacity and demand model by role and by week
- 02Time-and-motion sample across the operating core
- 03Cost-to-serve by product, client or channel
- 04Throughput and queue analysis with arrival profiles
- 05KPI tree separating leading from lagging indicators
- 06Operating cadence redesign: what is reviewed, by whom, how often
How the weeks are spent.
Fixed phases, fixed durations, one named owner on our side and one on yours. No open-ended discovery.
Baseline
1 weekEstablish demand, capacity and output from source data rather than from reported summaries.
Sample
1 weekStructured observation across roles to separate productive time, rework and waiting.
Model
1 weekCapacity, queue and cost-to-serve model, with sensitivity on the two variables that matter most.
Sequence
1 weekRanked intervention list with effort, payback and owner. No 40-point plans — five moves, in order.
What we are measured on.
Averages across comparable engagements. We agree the target range before kick-off and report against it at week six and week twelve.
A comparable engagement.
Before you commit.
If your question is not here, send it — we answer scope questions in writing before any engagement letter.
Ask a questionDo you need access to financial data?
How do you avoid cutting into muscle?
What is a typical leak size?
Can this run alongside a cost-reduction programme?
Start with a two-week diagnostic.
Fixed fee, fixed scope, and a written answer to where the waste sits in one process of your choosing.